  1. From the Projects drop-down menu in the JIRA top-level menu bar, select the project you wish to report on (If you plan to change to use a filter instead of a project select any project).

  2. You should now be on the project Summary Open Issues page.
    Image Removed
    Image Added


  3. Click on the Reports link on the left hand navigation menu. You will be presented with a page listing the available reports.



  4.  Click on the Root Cause Analysis Report link found in the Issue Analysis category.

...

Column NameDescription
Root Cause IssueThe issue that was identified as the root cause of the problem being investigated.
Attributer IssueThe issue and subsequent investigation that caused the Root Cause Analysis process to be performed.
AttributerThe user who identified the Root Cause Issue
Attribution DateThe date that the Root Cause Issue was identified (Attributed)
ResolverThe user that Resolved the Root Cause Issue.
Resolution DateThe date that the Root Cause Issue was resolved.
CloserThe user that closed the Root Cause Issue.
Closed DateThe date that the Root Cause Issue was closed.
Determination

The determination made by the Root Cause Issue Attributer, which can be one of the following:

Introduction FactorThe defect introduction factor selected by the Root Cause Resolver.
Detection FactorThe defect detection factor selected by the Root Cause Closer.
Review Status

Whether the Root Cause Analysis is complete by all affected parties, either action is still required (one of the summaries hasn't yet been completed) or analysis is complete:

...